Hoopers Creek Stabilization Complete

Streambank stabilization was completed in early June on a short reach of Hoopers Creek at the Livingston Farms subdivision in Fletcher, NC. Bank erosion was threatening a greenway trail and the backyards of multiple homes. Headwaters designed and permitted bioengineering measures and in-stream structures that will protect the bank and establish a robust riparian buffer. Construction was performed by South Core Environmental from Asheville.