French Broad River Bank Stabilization Completed

Headwaters Engineering worked with a group of volunteers to stabilize bank erosion along the French Broad River that was threatening the Camp Stephens Boy Scout Troop 26 building. Work was completed in March 2020 and the bioengineering treatments are already well established.
Recent Comments