French Broad River Bank Stabilization Completed

Headwaters Engineering worked with a group of volunteers to stabilize bank erosion along the French Broad River that was threatening the Camp Stephens Boy Scout Troop 26 building. Work was completed in March 2020 and the bioengineering treatments are already well established.

Tomahawk Branch Restoration Phase 2 Underway

Construction of the second phase of a stream restoration project on the Town of Black Mountain’s golf course is underway. Work on a tributary to Tomahawk Branch was completed in early June. Construction is being performed by South Core Environmental https://www.southcoreenvironmental.com/