2.4 Miles of Stream Restoration Completed in Asheville

Restoration of eight tributaries to the French Broad River was completed in July 2019. The streams had been badly damaged from excess stormwater runoff and the six-month effort included several thousand feet of newly constructed channel, installation of dozens of log and stone energy dissipation structures, and extensive bioengineering. Construction was completed by Land Mechanic Designs (https://landmechanicdesigns.com/)
Recent Comments